Sandy Bay

Works are currently on going at our Sandy Bay site in Ashington. This site consists of 25 caravan/lodge plots, where we are installing all aspects of groundworks. Upon arrival to the site, we were presented with many large piles of muck dotted about and therefore decided the best course of action would be to hire a bulldozer, which was used to level all the ground and resulted in us and the client saving a lot of money and time. The next step was to install all the surface water drainage and foul drainage, to the correct heights and levels, to connect to the concrete bases which will house the caravans and lodges. Using timber shuttering we then got the bases set out ready for concrete pouring, ensuring the bases were set to the correct height and levels. We were extremely satisfied with the outcome of the 25 bases installed and continued works by installing 6×5 bullnose kerbs to the road and tarmac base to keep the caravan site clean and tidy. To finalise our works, we had teams of men installing the driveways and top soiling around the plots to give it the aesthetically please finish.

Value: £432,000
Duration: 16 Weeks