Careful planning and preparation are essential
Modular (or Volumetric) building is fast becoming one of the most popular forms or modern building especially across due the Education, Commercial and a lot of Residential Sectors. This is due to the simplicity and speed of construction which leads to minimal business impact in comparison to some more traditional building methods, also with the materials used they look modern and contemporary, whilst greatly reducing their Carbon footprint. As the buildings are pre-fabricated up to 80% of the construction is completed offsite meaning the buildings can be completed in around a 6–8-week timescale. The exterior building and the interior work can be completed at the same time, and there are no weather delays as no concrete or other bonding materials are used in construction so more potential downtime is avoided.
However careful preparation and well organised planning are required with the onsite groundwork preparation to enable the modular building can be easily constructed with no delays once it is delivered to site. With this in mind careful planning and preparation are essential, and engaging with a knowledgeable Groundwork Contractor is essential in a modular building project for many reasons. From issues such as excavation to set land and road levels, choosing between different piling methods (Auger Piling, Flight Piing, Strip footing etc..) to ensure the site is structurally safe, right up to to supplying water, electric, gas and everything else needed to make the site run effectively and productively.
Here at Blackoak we offer a complete Turnkey Solution to facilitate any building project regardless of the size or complexity of your venture. Our vast experience in this sector means we can give expert advice on site structure, planning and preparation, technical planning issues, site requirements, ground conditions, drainage planning & issues, installation of roads & services as well as connecting into existing services and every other decision that could possibly need making.
We deal with all issues, such as working in tight spaces or problem areas, overcoming everyday problems with organisation of works and deliveries of materials and plant, making sure to avoid opening/closing/busy times for projects such as Schools and other public sectors.
Here at Blackoak we offer a complete Turnkey Solution to facilitate any building project regardless of the size or complexity of your venture. Our vast experience in this sector means we can give expert advice on site structure, planning and preparation, technical planning issues, site requirements, ground conditions, drainage planning & issues, installation of roads & services as well as connecting into existing services and every other decision that could possibly need making.
We deal with all issues, such as working in tight spaces or problem areas, overcoming everyday problems with organisation of works and deliveries of materials and plant, making sure to avoid opening/closing/busy times for projects such as Schools and other public sectors.
Basically, we offer an inclusive service which takes you from a plot of land or field and structurally, transform it into a functioning site which needs nothing more than the build teams to come in and erect the modular building. We will liaise with Architects, Quantities Surveyors, local councils, service providers and anybody else we need to speak to ensuring that your project runs smoothly and at the desired speed, without our client having to deal with the day-to-day management and problem that require a more technical and working knowledge of certain situations.
Avoiding downtime, proactively sidestepping potential issues and streamlining the process to maximise production whilst minimising outlay and cost. All our employees are trained and highly skilled, experienced and fully DBS checked as well as having all the necessary paperwork and training to be onsite and use any machinery required.
TESTIMONIAL
CASE STUDIES
We have recently completed Phase 1 of the Hundred of Hoo Academy project. This included excavating and installing a large, heavily reinforced, insulated raft foundation. A significant surface water solution…
Before Blackoak could begin any work at Swalcliffe Park School we ensured that we had a safe working environment that had extra consideration for the specialist residents. The site was…