Penally Grange

During our works on Penally Grange Lodge Park in Tenby, South Wales, there were residents present living on site, and thus we had to cause as little disruption as possible. We were given a deadline of 10 weeks from commencement, and completed the works in 8. The scope of works was to install eight 22ft x 44ft concrete bases/pads with amenities and services. Each plot required water, electric, gas, data, sewage, and water drainage, along with structuring roads, footpaths, turfing gardens, building a patio area, tarmacking 2 parking spaces, and other
building works. Each pad was installed using C35 concrete complete with fibres, at a depth of 150mm. The site was then levelled and landscaped around the plots using the material which had been excavated. The patio and gardens were installed with a blue facing brick, and a blue grey Indian stone patio to finish.

Value: £96,000
Duration: 8 weeks