Tay St

Blackoak are currently coming towards the end of the Tay Street project, a housing site consisting of 42 plots. As seen in the photos we take great pride in what we do. They also show some works including how we have installed all internal drainage to the plots, ensuring they are set to the correct measurements. Pipes have been secured by surrounding them in concrete to prevent any movement. Once the internal drainage is complete and the block and beam is in place, we begin prepping the floors for concrete screed. The photos show how we give additional visqueen to overlap the cavity and to prevent any concrete spillage on the brickwork. After the concrete has been installed in the plots, we will cut all the visqueen to ensure a tidy finish to the works taken place.

Value: £750,000
Duration: 52 Weeks